Sl. No | Items | Penalties proposed (Rs.) |
---|---|---|
1 | Non-installation/faulty Digital water Flow meter with telemetry system | 5000 |
2 | Non-disclosure/construction of additional groundwater
abstraction structures a) Non-functional Structures b) Defunct/Abandoned Note: Rates are for one unit and this shall be multiplied with total such structures to arrive at consolidated penalty. |
5000 |
3 | Reporting of fresh water zones as Brackish / Saline zones in application | 5000 |
4 | Non-Installation of Piezometer | 5000 |
5 | Non-Installation/faulty DWLR/Telemetry system | 1000 |
6 | Non-Construction/Inadequate capacity of Recharge/Water conservation structures | 5000 |
7 | Non-maintenance of Recharge structures | 5000 |
8 | Injection of treated/untreated water into the aquifer system
Note: In addition to penalty, the proponent shall bear the cost of aquifer remediation as per the provisions of Environment (Protection) Act, 1986 |
10000 |
9 | Non-Submission of Water level/Water quality Data | 2500 |
10 | Non-maintenance of log book of daily withdrawal/non-submission of Groundwater abstraction data | 5000 |
11 | Non-submission of photograph of recharge structure(s) | 1000 |
12 | Non-Submission of Self Compliance report | 2000 |
13 | Construction of groundwater abstraction structures by unauthorized/unregistered Drilling Rigs (per structures) | 5000 |
14 | Non-registration of water supply tankers | 5000 |
15 | Submission of false information/ undertaking | 5000 |