Reach us: +91 9281097233; tsgwrms.helpdesk[at]gmail.com

Government of Telangana

Ground Water Department

Sri A. Revanth. Reddy

Sri A. Revanth. Reddy

Hon'ble Chief Minister

Sri N. Uttam Kumar Reddy

Sri N. Uttam Kumar Reddy

Hon'ble I. & CAD Minister

Provisions of Penalties for Non-compliance of conditions under TSWALTA

Sl. No Items Penalties proposed (Rs.)
1 Non-installation/faulty Digital water Flow meter with telemetry system 5000
2 Non-disclosure/construction of additional groundwater abstraction structures
a) Non-functional Structures
b) Defunct/Abandoned
Note: Rates are for one unit and this shall be multiplied with total such structures to arrive at consolidated penalty.
5000
3 Reporting of fresh water zones as Brackish / Saline zones in application 5000
4 Non-Installation of Piezometer 5000
5 Non-Installation/faulty DWLR/Telemetry system 1000
6 Non-Construction/Inadequate capacity of Recharge/Water conservation structures 5000
7 Non-maintenance of Recharge structures 5000
8 Injection of treated/untreated water into the aquifer system
Note: In addition to penalty, the proponent shall bear the cost of aquifer remediation as per the provisions of Environment (Protection) Act, 1986
10000
9 Non-Submission of Water level/Water quality Data 2500
10 Non-maintenance of log book of daily withdrawal/non-submission of Groundwater abstraction data 5000
11 Non-submission of photograph of recharge structure(s) 1000
12 Non-Submission of Self Compliance report 2000
13 Construction of groundwater abstraction structures by unauthorized/unregistered Drilling Rigs (per structures) 5000
14 Non-registration of water supply tankers 5000
15 Submission of false information/ undertaking 5000